- /Solar & Battery
- /Case Studies
- /Fulbourn Road Technology Park, solar PV
Overview
Client:
Fulbourn Road Technology Park
Location:
Cambridge, UK
To cut carbon emissions and help meet their energy performance targets, Fulbourn Road Technology Park turned to solar. Plug me in delivered a game-changing 243 kWp PV system that generates 202,302 kWh annually and slashes their CO2 emissions by 39.2 tonnes every year.
This project not only helps the Park hit its energy performance targets but also reinforces its commitment to sustainability – ensuring that some of Cambridge’s brightest innovators are working in a space powered by clean energy.
Fulbourn Technology Park key details:
EMISSIONS SAVING:
39.2 tonnesSYSTEM CAPACITY:
243 kWpENERGY GENERATION:
202,302 kWhNUMBER OF PANELS:
580Powering innovation with clean energy in Cambridge
Overview
Fulbourne Road Technology Park in Cambridge comprises a mix of commercial high-tech and research and development premises, with laboratory and office workspaces for the area’s diverse range of occupiers.
To help meet the Park’s energy performance targets and ensure it maintains the highest sustainability standards, installing a solar PV system was an obvious choice.
And having worked with Plug me in before, Andrew Potter, Co-Owner and Managing Director of Hilton Cannon who led the development of the project, knew exactly who to call:
“Plug me in’s technical support and expertise were perfect for this type of commercial project. From initial outline and concept to production of detailed drawings and technical details, the process was always timely and accurate.”
Installation Details
Plug me in installed a 243 kWp solar PV system made up of 580 solar panels – a system powerful enough to generate 202,302 kWh and reduce the Park’s CO2 emissions by 39.2 tonnes a year. Across the system’s lifetime, this equates to removing 166 petrol-powered vehicles from the road.
Speaking of the end-to-end process, Andrew said:
“The service we receive from Plug me in has always been very professional – from initial contact, through design and approval, to installation and commissioning on site. The installation team are very skilled and we felt well supported through the entire phase of work.”
Financial and Environmental Impact
Since installation, the system has already performed as expected, hitting generation targets and successfully reducing the Park’s carbon emissions.
Plug me were delighted to support the development of the Park with a high-tech solar PV system that brings real operational and environmental impact – matching the progressive, forward-thinking nature of the Park and its occupants.
Start your solar journey today
Our team of experts will guide you every step of the way. Start your journey towards sustainable energy savings today.



We've powered ahead 1000+ customers